Process Heat Recovery

Help and discussion on using the Detailed HVAC option

Moderator: DesignBuilder Support

ag
Posts: 2

Process Heat Recovery

Postby ag » Mon Jun 12, 2017 11:01 am

Hi everyone,

Is there a way I can include in my model heat recovery from the process is carried out within the building? I want to use the recovered heat to heat some spaces of the building. This heating system would be toped up with LPG boilers but I expect that approximately 70% of the heating demand would be covered by the heat recovery system. I was thinking to increase considerably the boilers' efficiency (e.g. 300%), but I wonder if there is a more accurate way to do it.

Thanks a lot.

AG

Return to “EnergyPlus HVAC”